I'll fill in the details soon, but here's a quick rundown on what's going on:
Kitchen:
- Demolition is supposed to start tomorrow!
- Appliances are ready to be delivered
- Floor tile is sitting in the dining room
- Backsplash tile is being made (more on this later)
- Sink is being made
- Cabinets are being shipped on August 7th
- Granite counter top is at the granite shop ready for delivery
Rest of inside of house:
- Floors in the front half of the house are being refinished right after the kitchen gets going
- Living room will be painted
- I'll share an interesting story about my fireplace
Garage:
- Electrical is in and has had the rough inspection
- Ronda and I have put up about 90% of the drywall -- well, 90% of the walls. We want to do the ceiling, too.
Backyard:
- The hot tub has been in for a while
- Ronda and I worked our tails off putting in two flagstone paths, with one more to go
- The sprinkler system is in
- The ground is ready for sod, once the heat dies down a bit
Whew! A lot going on here. I'll take a few of the more interesting points above and flesh them out in their own entries with pics to match.